Skip to Content
SUPPORT
Matrixx Infusion SupportInjection Panel Installation

Matrixx Infusion Support

Injection Panel Installation

1

Layout the parts for the injection panel, then locate a suitable area where the panel can be installed

Install the stainless steel mounting rail. A level can be used to make sure the bar is installed properly. This bar should be secured to the wall studs or a wood backing plate that is secured to the wall studs.

2

Hang the panel on the wall and install the inlet fitting

BE SURE to Teflon tape the threads and tighten the fitting using the proper tools.

3

Install the outlet fitting

BE SURE to Teflon tape the threads and tighten the fitting using the proper tools.

When pressurizing the system, feed the water slowly by opening the inlet water valve in small intervals. Shocking the meter by over speeding it with high flow rates can damage the internal assembly.

Ensure the piping is properly aligned and supported both upstream and downstream of the panel.

NOTE: It is the installers responsibility to comply with all national and local plumbing and electrical codes.

NOTE: A 3/4" meter is used to detect flow rates as low as 0.25 GPM. Undersink RO systems and humidifiers can go undected while using a 1" meter. Flow rates will not be decreased while using this in conjunction with 1" plumbing.

Need more help?

Ask a different questionMatrixx Infusion Support
Select a different product
Sitemap
ABOUT USAbout UsPrivacy PolicyShipping PolicyRefund & Return Policy